Automatically build a process Yamazumi directly from your work instructions By Geneo
Should doing a work balance on a line be a separate activity from building the standard work?
At GENEO, we don't think so.
With GEN-OPS, the work described in the standards is used to automatically build the Yamazumi.
Use Change Masters to plan future production changes. Use Derivatives to efficiently describe every process variation, and then, as the customer demand changes, change the weightings to see how changing demand affects the line balance.
Build your process, add standards to your workstations, change the mix to reflect changing customer demand and then move the work around to balance the line while all the time keeping your Work Instructions in sync.
If interested, why learn more about GENEO's solutions at www.GENEO.co.uk?
Contact us today https://www.geneo.co.uk/contact-geneo/
Follows Us On:
Contact Details:
7 Parade
Leamington Spa
Warwickshire
CV32 4DG
United Kingdom
Consulting
+44 (0)1926 940964
Software and general
+44 (0)1926 423132
Contact Name:: Tim King : 07810820414
Email: timking@geneo.co.uk